Project
45
Concrete Paving Works for the Auxiliary Stadium – Al-Aziziyah Sports City
Implementation of concrete paving works for the auxiliary stadium at Al-Aziziyah Sports City as part of infrastructure development.
This project aimed to implement concrete paving works for the auxiliary stadium at Al-Aziziyah Sports City as part of a plan to develop sports infrastructure. The works included ground preparation and execution of concrete paving layers in accordance with approved technical specifications to ensure durability, load-bearing capacity, and safety, while complying with quality and safety standards.
Project Photos
Related
Equipping Works for Al-Aziziyah Sports City
Hybrid Turf Stadium – Al-Aziziyah Sports City
Surface Coating Works for Auxiliary Courts (Tennis, Volleyball, Basketball, and Handball)
Foundations Works for Lighting Towers – Al-Aziziyah Stadium
Installation of Sprinklers for the Auxiliary Stadium – Al-Aziziyah Sports City
Construction of Drainage Channel for the Auxiliary Stadium – Al-Aziziyah Sports City