Al Ittihad Tripoli Club Maintenance Project (2012) – Lighting Towers Installation
A maintenance project for Al Ittihad Tripoli Club in 2012, including the installation of lighting towers to improve illumination levels and enhance stadium readiness for sports events.
The Al Ittihad Tripoli Club Maintenance Project (2012), which included the installation of lighting towers, is a key technical initiative aimed at upgrading sports infrastructure.
The scope of work covered construction of concrete foundations for lighting towers, supply and installation of towers, electrical cabling, and installation of stadium-grade lighting fixtures.
The project was executed according to approved technical specifications to ensure balanced light distribution, reduced shadows on the playing field, and high operational safety, enhancing the quality of matches and events.
Project Photos
Related
Equipping Works for Al-Aziziyah Sports City
Hybrid Turf Stadium – Al-Aziziyah Sports City
Surface Coating Works for Auxiliary Courts (Tennis, Volleyball, Basketball, and Handball)
Foundations Works for Lighting Towers – Al-Aziziyah Stadium
Concrete Paving Works for the Auxiliary Stadium – Al-Aziziyah Sports City
Installation of Sprinklers for the Auxiliary Stadium – Al-Aziziyah Sports City