Project
66
Documentation of Control Panels Assembly for Lecture Halls
Photographic documentation of the assembly and installation works of control panels for lecture halls
This project aimed to document, through photographs, the assembly and installation works of control panels for lecture halls as part of the implementation and development phases of educational facilities. The works included assembling electrical control panels and related control systems, with documentation of execution stages reflecting system readiness and installation quality in accordance with approved technical standards
Project Photos
Related
Equipping Works for Al-Aziziyah Sports City
Hybrid Turf Stadium – Al-Aziziyah Sports City
Surface Coating Works for Auxiliary Courts (Tennis, Volleyball, Basketball, and Handball)
Foundations Works for Lighting Towers – Al-Aziziyah Stadium
Concrete Paving Works for the Auxiliary Stadium – Al-Aziziyah Sports City
Installation of Sprinklers for the Auxiliary Stadium – Al-Aziziyah Sports City