Project
33
Installation of Central Air Conditioning System at Lecture Halls – University of Tripoli
Implementation of central air conditioning system installation works at lecture halls of the University of Tripoli as part of development and equipping works.
This project aimed to implement the installation of a central air conditioning system at the lecture halls of the University of Tripoli as part of a plan to improve the learning environment and develop educational facilities. The works included the supply and installation of central AC units, distribution and ventilation networks, and system calibration in accordance with approved technical specifications to ensure a comfortable and suitable environment during the educational process, while complying with quality and safety standards
Project Photos
Related
Equipping Works for Al-Aziziyah Sports City
Hybrid Turf Stadium – Al-Aziziyah Sports City
Surface Coating Works for Auxiliary Courts (Tennis, Volleyball, Basketball, and Handball)
Foundations Works for Lighting Towers – Al-Aziziyah Stadium
Concrete Paving Works for the Auxiliary Stadium – Al-Aziziyah Sports City
Installation of Sprinklers for the Auxiliary Stadium – Al-Aziziyah Sports City